Home › Simulation
Information
Preview 2 platforms
iPhone 5 images
iPad 5 images
Description
You are the chief dispatcher of the Leningrad regional grid. Saint Petersburg — the Northern Capital — expects power 24/7. The infrastructure is aging. Every winter tests your decisions.
NORTHERN CAPITAL ENERGY is a turn-based power grid simulator set in Saint Petersburg. Balance generation from 10 real power plants, maintain 20+ substations, and keep critical consumers — metro, hospitals, railways, water utilities — online no matter what.
MANAGE REAL POWER STATIONS
Leningrad NPP, Volkhovskaya HPP, Narvskaya HPP, and seven thermal plants. Each has its quirks: Volkhov swings with the seasons. Narva can be cut off by a diplomatic incident. Central CHP (built in 1897) wears down fast.
A LIVING SAINT PETERSBURG
Play on a hand-drawn map with the Neva river, drawbridges that open every night, ships sailing past the Hermitage, planes heading to Pulkovo, aurora over Lake Ladoga. Peter and Paul Fortress, the Admiralty, St. Isaac’s Cathedral — all where they belong.
NAVIGATE IMPOSSIBLE TURNS
Winter storms damage substations. Floods take Vasilyevsky offline for two turns. A presidential visit means Smolny must stay powered or you are fired. White Nights cut lighting demand in half. Every season rewrites the rules.
ON-DEVICE AI EVENTS
On iOS 26+, the on-device language model generates atmospheric flavor events: a cat climbs into a transformer, a Dostoevsky reading on the Field of Mars, pigeons nesting on transmission lines. Every playthrough feels different — and your data never leaves your device.
FEATURES
• 10 real power stations and 20+ substations with individual wear
• Stylized Saint Petersburg map with animated Neva, drawbridges, ships, planes, aurora
• Turn-based strategy with seasons, weather events, and political crises
• Full financial report: income, expenses, balance trend charts
• 5 player ranks from Intern to Master Power Engineer
• Autosave and Continue support
• Localized in English, Russian, and Spanish
• On-device AI flavor events on compatible devices
• No ads. No in-app purchases. No tracking. Fully offline.
Accessibility
ipadiphonemacrealityDevicetvoswatch
Version history 1 versions
Build 884602771v1.02026-04-17 01:02:55
No pricing data captured yet — comparisons appear once the app has paid storefronts or in-app purchases.
Availability 1 of 1 storefronts
| Region | Language | Price | Ratings | Avg | Version |
|---|---|---|---|---|---|
US | en-US | Free | 0 | — | 1.0 |
Change log 4 changes · US
✎
description updated
You are the chief dispatcher of the Leningrad regional grid. Saint Petersburg — the Northern Capital — expects power 24/7. The infrastructure is aging. Every wi
✎
subtitle updated
Power Grid of Northern Capital
✎
name updated
Northern Capital Energy
◆
Version 1.0 released